Why Choose Quik-Therm Matrix Over Traditional Z-Girts?

Quik-Therm Matrix eliminates the need for conductive metal girts, providing a continuous thermal barrier that significantly reduces heating and cooling costs.

 

FeatureSteel Z-Girt AssemblyQuik-Therm Matrix System
Thermal BridgingHigh: Steel conducts heat 400x faster than woodZero: Virtually 100% thermal bridge-free
Effective EfficiencyOnly 47% – 57% of nominal R-value100% of nominal R-value
ComponentsMultiple (Girts, Clips, Shims, Insulation)Integrated (Insulation + Furring + Drying)
Installation SpeedSlow: Requires precision layout of metal50% Faster: Installs like standard panels
Moisture RiskHigh: Metal fasteners can cause dripping/mouldLow: Built-in drainage & drying channels

The “Cost Vs. Value” Summary For Clients

  • Z-Girts are a “cheap” material that leads to an expensive, inefficient building.
  • Quik-Therm Matrix is a high-performance system that pays for itself through reduced labour costs during construction and lower energy bills for the life of the building.

Beyond R-Value: Installation And Moisture Control

While R-value gets all the marketing buzz, air and moisture management are what keep a building standing for 50 years:

  • Simplified Labour: Traditional Z-Girts require a “layer-cake” approach – installing the girts, then the insulation, then the shims, then the cladding. Quik-Therm Matrix is a singular, lightweight panel. This reduces the number of trades on-site and slashes labour hours.
  • The “Sweating Wall” Problem: Because metal girts are cold points within a warm wall, they are magnets for condensation. Over time, this “sweating” leads to rust, rot, and indoor air quality issues. Matrix is non-conductive, meaning the dew point stays outside the structural wall.
  • Built-in Drainage: Quik-Therm Matrix includes an integrated drainage plane. If moisture does find its way behind the cladding, it has a clear, unobstructed path to exit, keeping the building envelope dry and healthy.

The Bottom Line: Cost Vs. Value

It is a common pitfall to look at the “sticker price” of Z-Girts and assume they are the cheaper option. However, once you factor in the labour costs of a slower installation and the energy penalties of a 50% effective R-value, “the cheap” option becomes the most expensive part of the building.

The Reality Check

Choosing Z-Girts is like buying a high-end furnace but leaving the front door wide open. Quik-Therm Matrix is a high-performance investment that pays for itself through immediate labour savings and permanent reductions in monthly utility bills.